Planning Permission in Dublin and Meath

Planning Permission

From first sketch to decision, we prepare and manage planning applications across Dublin and Meath. Survey, drawings, forms, notices and correspondence with the planning authority, handled for you.

  • Engineers Ireland members
  • 3 day report turnaround
  • ★ 5.0 on Google
  • Dublin and Meath

Not sure this is the right one? Which survey do I need

Who it's for

Is a Planning Permission right for you?

  • Homeowners extending or converting
  • Owners applying for retention of existing works
  • Self builders applying for a new dwelling
  • Businesses seeking a change of use

What's covered

What the survey covers

  • Measured survey of the existing property
  • Design development and options
  • Site layout, plans, elevations and sections
  • Planning forms, notices and fee calculation
  • Submission and liaison with the planning authority
  • Responses to requests for further information

How it works

From booking to report in 3 days

A simple process, with someone qualified on the other end of the phone at every stage.

  1. 1. Book or request a quote

    Tell us about the property and when suits. Send a booking request, or ask for a quote and we come back with a price.

  2. 2. We arrange access

    We deal with the estate agent, builder or solicitor directly so you do not have to chase anyone.

  3. 3. Survey day

    A qualified engineer, surveyor or architect inspects the property in detail and photographs everything relevant.

  4. 4. Report within 3 days

    Your written report arrives within three working days, followed by a call to talk through the findings.

Your report

What you get in the report

Clear, photographed and written so you can act on it, not just file it.

  • A complete drawing set for submission
  • Planning application lodged on your behalf
  • Guidance on conditions attached to any grant
  • Advice on what happens next for construction
  • A follow-up consultation with the design team

Request a price

Get a quote for your Planning Permission

Tell us about the project and we will come back with a price and a timeline.

Planning Permission: Free quote, no obligation

Your details (applicant)
The project

For example D15 X2Y3

Images or PDFs, up to 10MB each

Just looking for a price?

Questions

Planning Permission questions

How long does planning take in Dublin or Meath?

A straightforward application typically takes around eight weeks for a decision, longer if further information is requested or a third party appeals.

Do I need permission for my extension?

Some works are exempted development within set limits. Send us the details and we will tell you whether an application is needed.

Can you help with retention?

Yes. We regularly prepare retention applications for works already built, often alongside an Opinion on Compliance.

What do you need from me to quote?

A description of the project, the address, and any photos or existing drawings you have. Upload them with your enquiry.

Why us

What sets My House Survey apart

3 day report turnaround

Your full written report lands within three working days of the survey.

Qualified professionals only

Every survey is carried out by a qualified engineer, surveyor or architect. Never a subcontracted inspector.

After sales support included

A follow-up consultation comes with every survey, so you understand each finding and what it means for your purchase.

Engineers Ireland membership

We work to professional standards you can rely on, and that your solicitor and lender need.

Related services

Not sure which survey you need?

Talk it through with us. We are open monday to sunday, 7am to 7pm.

Call 087 390 6015
WhatsApp
Call 087 390 6015Book a survey